GK UPGRADE ENERGY
Contact Title
Contact us 17, naupliou kaimakli
Contact Title
Address: 9.00am - 6.00pm

Installation Procedure

image
image

Solar Installation Process: A Step-by-Step Guide

1. Initial Consultation and Assessment:

  • Give us a call to arrange for our expert to visit your premises for a free appointment and consultation.
  • Our expert will assess your home's energy consumption and roof suitability for solar panels.
  • We'll prepare a detailed offer outlining the most suitable products for your premises based on your needs and energy bills.

2. Contract and EAC Application:

  • If you accept our offer, a contract will be signed.
  • You will need to pay the EAC (Electrical Authorities of Cyprus) application fee at this stage.
  • Our team will assist you in completing the necessary EAC application forms.

3. EAC Approval and Installation:

  • Once we receive EAC approval, we will contact you to schedule the installation.
  • Our skilled technicians will install your solar system efficiently and safely.

4. Grid Connection and Final Approval:

  • After the installation is complete, we will apply for connection to the EAC network.
  • We will arrange a final inspection with the EAC to obtain their approval.

5. Monitoring and Maintenance:

  • Our commitment to your satisfaction continues beyond installation. We offer comprehensive monitoring and maintenance services to optimize system performance.

Required Documents for EAC Application:

  • Copy of the EAC recent utility bill (Last 12-month energy consumption)
  • Title to the premises or building permit of the residence
  • Topographical plan of the plot
  • Signed certificate of use as a residential unit
  • Consent of owners if more than one (ask for an application form)
  • If communal roof, authorization from other users

Have your photovoltaic installation done with our hassle-free installation process.